View Post

Hybrid Power System | Solar Case Study

In Case Studies, CS - Hybrid Power Systems, CS-Federal Government by admin

One of the logistical challenges facing SunWize was the transportation of foundation materials to the site via boat and manual labor. To avoid the tremendous effort associated with the transport of materials such as cement and aggregate, SunWize used earth augers as solar array anchor points. The augers were hand installed and exceed specifications for maxi-mum wind loading at 120 mph.